Panašios prekės Chamber Furnace AAF 11/18 1100°C, 18 litre Basisregler EPC3016P1

Chamber Furnace AAF 11/18 1100°C, 18 litre Basisregler EPC3016P1

Prekė gali skirtis nuo prekės, parodytos nuotraukoje

  Prekės numeris Aprašymas Kaina  
00065408 Chamber Furnace AAF 11/18 1100°C, 18 litre Basisregler EPC3016P1
Ashing & Burnoff Chamber Furnace (380 - 415 V -SR-three phase + N) The picture shows an item from the same kind. Size and outfit could be different to that type. PID-Controller one ramp to setpoint 99 hour process...
7.330,00 Euro Kaina už 1 vnt.

00065411 Chamber Furnace AAF 11/32 1100°C, 32 litre Basisregler EPC3016P1
AAF 11/32 1100°C, 32 litre, Ashing & Burnoff Chamber Furnace (380 - 415 V three phase + N) PID-Controller one ramp to setpoint 99 hour process timer which can be programmed for a timed delay at the start of the process...
9.510,00 Euro Kaina už 1 vnt.

00065414 Chamber Furnace AAF 12/18 Basisregler EPC3016P1
Ashing & Burnoff Chamber Furnace (380 - 415 V -SR-three phase + N) The picture shows an item from the same kind. Size and outfit could be different to that type. PID-Controller one ramp to setpoint 99 hour process timer which can be...
9.480,00 Euro Kaina už 1 vnt.

00065417 Chamber Furnace AAF 12/32 Basisregler EPC3016P1
AAF 12/32 1200°C, 32 litre, Ashing & Burnoff Chamber Furnace (380 - 415 V three phase + N) PID-Controller one ramp to setpoint 99 hour process timer which can be programmed for a timed delay at the start of the process or used as a...
11.870,00 Euro Kaina už 1 vnt.